Cams Hall, Cams Hill, Fareham, Hampshire, PO16 8ABsales@reliass.com+44 1329 227 448
  • Partners
  • Publications
  • News
  • Links
Top
ReliassReliass
Reliass
Reliability And Safety Software Solutions
  • Home
    • News
  • Products
    • 1. Advanced Specialty Engineering Networked Toolkit (ASENT)
    • 2. Advanced Integrated Maintenance Support System (AIMSS)
    • 3. EAGLE Logistic Support Analysis Record (LSAR)
      • Eagle Training Manuals
    • 4. EAGLE Maintenance Management Information System (MMIS)
    • 5. Eagle Publishing System (EPS)
    • 6. D-LCC
    • 7. FavoWeb FRACAS Software
    • 8. PHM Commander
    • 9. PRISM
    • 10. RAM Commander
    • 11. RAMP
    • 12. SCAT
  • Services
    • Industries
      • 1. AEROSPACE
      • 2. AVIATION
      • 3. AUTOMOTIVE
      • 4. DEFENCE
      • 5. NUCLEAR
      • 6. OIL & GAS
      • 7. POWER
      • 8. RAIL
    • Software Reliability and Safety
    • Reliability Engineering and Safety Services
    • Failure Data Collection (FRACAS)
    • ILS & LCC
    • Thermal Management and Analysis
    • Quality Engineering
    • Quality Assurance
    • MTBF Calculation Service
    • Six Sigma
  • Downloads
  • Training
    • Related Books
  • Contact
    • UK Office
    • USA Office
Menu back  
 
FacebookTwitterLinkedinGoogle+

D-LCC

reliability software button

D-LCC

D-LCC is a powerful yet very flexible Life Cycle Costing Program.Below you will find further information on:

[icon_counter icon_type=”selector” icon=”Defaults-line-chart” img_width=”48″ icon_size=”56″ icon_color=”#e64b09″ icon_style=”none” icon_color_bg=”#ffffff” icon_color_border=”#333333″ icon_border_size=”1″ icon_border_radius=”500″ icon_border_spacing=”50″ flip_box_style=”advanced” border_size=”2″ border_color=”#a4a4a4″ box_border_style=”none” box_border_size=”2″ box_border_color=”#a4a4a4″ box_border_color_back=”#a4a4a4″ block_title_front=”Why D-LCC ?” text_color=”#333333″ bg_color=”#efefef” block_text_color=”#e64b09″ block_front_color=”#f9f9f9″ block_desc_back=”The identification of appropriate software was crucial for our LCC project. Several software vendors were researched. D-LCC was the only product, exclusively engineered to address LCC, but not specific to a sector, industry, or technology. D-LCC also answered our criteria: flexible enough to build a model ‘from scratch’, since ‘canned’ models all contained legacies of disappearing procurement paradigms, and powerful and user-friendly enough to allow model-building expeditiously.“ Robert N. McGrath, ERAU“” block_back_text_color=”#494949″ block_back_color=”#ffffff” button_bg=”#333333″ button_txt=”#ffffff” flip_type=”horizontal_flip_left” height_type=”ifb-jq-height” box_height=”300″ title_font_style=”font-style:italic;”]

  • Life Cycle Costing


  • Total Cost of Ownership


  • Cost Analysis


  • Ease of Use

Life Cycle Costing

Life Cycle Cost (LCC) analysis and Total Cost of Ownership evaluation are the basis for decision making for the wide range of industries and equipment: from IT systems to submarines. LCC analyzes the total ownership costs of various design alternatives and system’s components over the projected life cycle of a system.

D-LCC (Decision by Life Cycle Cost) makes the LCC analysis easy and comprehensive. D-LCC is a key tool for managers, decision-makers, engineers, ILS personnel, and other staff involved in system acquisition, proposal writing, management, development, production and through-life support.

cbs

D-LCC combines the Cost Breakdown Structure (CBS) with Product Breakdown Structure (PBS) and applies the bottom-up calculation incorporating the time-scale (life cycle phases).

Total Cost of Ownership

Total Cost of Ownership and Life Cycle Cost analysis with D-LCC:

Evaluation and comparison of alternative design approaches.
Comparison of alternative strategies
Identification of cost effective improvements
Project’s budget and economic viability assessment
Long term financial planning

Life Cycle Cost is defined by using a supplied or creating a new Cost Breakdown Structure (CBS) and allocating cost variables to each CBS primary element. D-LCC provides bottom-up cost estimating, supports detailed examination of the costs and parameters affecting LCC, and performs Net Present Cost analysis.

Cost Analysis

D-LCC allows the user to apply pre-defined LCC models as well as to create new Cost structures and models. An existing CBS can be easily tailored to meet all needs of any particular project.

Product Tree Cost Calculation option allows for incorporating the Product Tree parameters in LCC model and calculating any required cost elements (like spare parts cost for each Level of Repair) across all Product Tree items.

State-of-the-art features and options

Net Present Cost (NPC)
In financial and budgetary analysis, a necessary requirement is to identify the present value of future cash flows called Net Present Cost. The NPC analysis also provides comparison of options with different inflation and discount rates, and is enhanced through sensitivity analysis of these rates.
Cost Profile Analysis
D-LCC supports detailed examination of dynamics of future cash flows over multiple time periods

dlcc cost analysis

Cost Profile evaluation

Optimal Repair Level Analysis (ORLA)

D-LCC includes a powerful ORLA module for calculating the cost and effectiveness of various Level of Repair alternatives per product tree item, thus supporting optimal decision making

The main reports and analyses available in D-LCC:
  • Total and Detailed Costs
  • Cost Profile
  • Cost Profile by Elements
  • Cost-Effectiveness
    • Basic CBS Tree
    • Optimal Repair Level Analysis
    • Versatile User-definable Graphs and Tables
Sensitivity Analysis

D-LCC Sensitivity Analysis option in computes changes in the LCC/TCO according to changes of any global variable. The sensitivity analysis identifies major cost drivers (Pareto “vital few”), supports trade-off analysis and indicates the effect of altering critical parameters and assumptions.

sensitivity analysis

Sensitivity Analysis

Cost-Effectiveness evaluation

Managers are interested in cost-effectiveness which is typically calculated in terms of performance per unit cost. D-LCC’s Cost-Effectiveness module provides this insight as well as other effectiveness measures.

Cost Item analysis

D-LCC provides a utility to calculate the costs of a particular budget line item. This “Cost Item” function computes the contribution of any item, such as labor, or material. Results are reported at the element level and rolled up into a project total.

Cost Profile by Cost Elements

Cost Profile by Cost Elements

Convenience and Ease of Use

D-LCC’s libraries make the LCC analysis procedure highly efficient:

Alternatives library — a list of all possible alternative decisions, policies, etc.

Periods library — a list of future periods or life cycle phases

Global Variables library — a set of Global Variables valid throughout the cost model and affecting many cost elements, e.g. escalation and discount rates.

D-LCC is also data compatible with RAM Commander.

Graphical representation of Cost Breakdown Structure providing convenient and fast data input and search

Spreadsheet-like, easy to modify cost models for each CBS element

Drag-and-drop and cut-paste for copying and editing of CBS and PBS elements
Automatic calculation of total cost by alternative and period
Powerful Expression Builder for the calculating algorithm creation

Global change for all required elements — by changing a global variable, the user can immediately update many items throughout the project.


Please contact us for further information on any of our products and services or if you simply wish to find out how D-LCC can help your organisation.

 

Functional Packages

PREDICTOR
  • 5 Standard Operating Reliability Prediction Methods
  • BOM Builder, Temperature Curves, Mission Profile, and Import Wizard
  • Full set of ready-to-print Reliability Reports
  • Enhanced Report Generator for user defined reports
RELIABILITY PRO
  • 5 Standard Operating Reliability Prediction Methods
  • BOM Builder, Temperature Curves, Mission Profile, and Import Wizard
  • User Defined Components Reliability Data Module
  • Full set of ready-to-print Reliability Reports
  • Enhanced Report Generator for user defined reports
  • Components Library Module (over 400k components)
  • RBD – Reliability Block Diagram
MAINTAINABILITY PRO
  • Maintainability Module (according to MIL-STD-472 Procedure 5A)
  • Built in libraries for Tasks, Times, STE, Skills, and Materials
  • Maintenance Engineering Report (MEA Report)
  • Maintenance Task Analysis Report
  • Full set of ready-to-print Reliability Reports
  • ILS Supprt Fields (user defined)
  • BOM Builder, Temperature Curves, Mission Profile & Import Wizard
  • Enhanced Report Generator for user defined reports
  • RCM/MSG-3 Module
  • FMECA Module
FAILURE ANALYSIS & ISOLATION
  • BOM Builder, and Import Wizard
  • FMECA (covering both Hardware & Functional) Module
  • Customizable FMECA Worksheet
  • FTA Module
  • FMECA Import/Export
  • Testability Module
  • Full set of FMECA & FTA ready-to-print Reports
  • Full set of ready-to-print Testability Reports including graphical trouble shooting, fault isolation, etc.
  • FMD-97 Library
  • Enhanced Report Generator for user defined reports
SAFETY ASSESSMENT
  • SSA supporting IEC 61508 (Safety Standard for Safety Instrumented Systems) and MIL-STD-882D (SHA, O&SHA), SAE, ARP 4754A, and ARP4761
  • Customisable FMECA Worksheet
  • FTA Module
  • RBD Module
  • Markov Chains Module
  • FMECA Import/Export
  • Full set of ready-to-print Safety Reports
  • Enhanced Report Generator for user defined reports
AVIATION SAFETY
  • SSA & FHA according to SAE, ARP 4754A, ARP4761, and FAR 25 1309b
  • FTA including ready-to print reports
  • MSG-3 (System, Zonal, and Structural) including ready-to-print reports
  • MMEL including ready-to-print 5-column report
  • FMECA including ready-to-print FMECA reports, BOM Builder, and Import Wizard
  • Enhanced Report Generator for user defined reports
  • Report Template Utility for layout customisation
  • FREE Seminar on the World Leading FRACAS Tool
    6th July 2014
  • eagle
    EAGLE Conference 21-24 October 2013 !
    6th August 2013
  • Six Sigma Distance e-learning
    1st March 2014
  • BAE Systems Partner Logo
    BAE selects ASENT R & M ToolKit and ASENT FRACAS
    12th February 2015
  • AIMSS version 4.7 is now released
    2nd June 2013
  • Reliass Logo
    Looking for short-term or long term RAMS/ILS Contractors?
    1st January 2015
Quick Contact
Use the form below to get in touch for any questions or comments.

Submitclear

© 2015 Reliass | Website by Rinths Ltd
  • Partners
  • Publications
  • News
  • Links
Top